About us
Gantman Evgeniy
Senior Project Engineer/ Technical Director
|
Minsk, Belarus |
|
+375 (29) 695 55 52 |
|
|
|
||
|
||
Ready for relocation worldwide |
|
Summary of qualifications
|
|
Work experience
February 2021 – present time: Chief Project Engineer in CredoExpertProekt Private Enterprise, Minsk, Belarus
Construction and project engineering of industrial facilities
Job responsibilities:
-
Ensure a high technical and economic level of designed facilities and the quality of design documentation, track and optimize labor and material costs during the construction and operation of facilities;
-
Control and manage quality, budget, safety, and schedule of the project;
-
Together with the design departments define the scope of work for the construction objects, prepare the basis for the contracts for project engineering services;
-
Project management
-
Wide working interface with subcontractors, define the standard and reusable cost-effective technological solutions, assemblies, structures, and products with the aim of their widespread use in project engineering;
-
Coordinate planning and surveying activities throughout the project, timely solve any issues related to project engineering and occurring at the construction, commissioning, and reaching of project capacity;
-
Ensure the compliance of architecture and construction projects with the engineering project assignment;
-
Execute the architectural supervision of the construction process;
-
Participate in pre-commissioning, commissioning, and start-up to ensure successful completion of projects.
April 2018 – January 2021: Chief Project Specialist in Investment Group S.A. and K. LLC, Minsk, Belarus
Full-scale construction management and engineering services
Key achievements:
-
Led the design engineering project of a 260,000 m2 facility consisting of an administration high-rise building of 185m height, a hotel with a congress center (Radisson Blue), class A administrative buildings, a childrens’ center, a bank, a stylobate part with a parking, a medical center, a sports center, an energy center (uninterrupted energy efficient system of heat / cold supply of the complex, data center).
-
Performed BIM together with AECOM (TOP 100 International Contractors and Environmental companies), Rizzani de Eccher (TOP 100 International Contractors), Carlson Rezidor Hotel Group.
-
Developed special technical conditions (norms) related to HVAC for high-rise buildings and multifunctional complexes construction. Developed “smart climate” systems for buildings of various purposes.
-
Performed a full engineering consultation on HVAC systems at the construction of a 15,000m2 metalworking plant from design assignment to commissioning.
-
Led HVAC project and field supervision for the Embassy of the Republic of Azerbaijan Building in Belarus, developed a cost-efficient cooling system for Belgazprombank data center.
-
Carried out BIM coordination of a multifunctional complex (Revit, Dynamo, Navisworks, Solibri, Magicad).
Job responsibilities:
-
Control the development of a few sections in the design documentation related to Architectural design, Construction project phases (e.g., Heat supply, Heating, Ventilation, Cooling supply, Air conditioning, Technological solutions of the Energy Center);
-
Control the deadlines of the project documentation issue, the technical level of the project decisions taken, the timing of the development of the project documentation;
-
Ensure the duly performance of the subcontracted design companies, provide acceptance of works in accordance with the project documentation;
-
Led the drawing up and amending the regulations, the changes to the Technical design specification, Project facility objective, Technical Requirements, etc.
October 2014 – April 2018: Chief Design Specialist in Gazprom Transgaz Belarus OJSC, Branch for the construction of a multifunctional complex
Construction of a multifunctional complex
Key achievements:
-
Achieved a HVAC system signification cost saving at the Gazprom facilities, that reached 20 Mln USD, the total project cost reaching 1,2 Bln USD.
-
Obtained BREEAM Gold Level Certification for a high-rise administration building and hotel with a congress center.
-
Developed internal standards of control and interaction with the contractors, consultants, and operators from writing a technical design specification to acceptance and review of project documentation.
-
Controlled the energy efficiency of electricity, heat, and cold production by the energy center throughout the year through trigeneration.
-
Developed technical design specifications for the entire design of heating, ventilation, air conditioning systems for an innovative multifunctional complex.
-
Participated in the development of a technical design specification for a fully automated building management system (BMS) united by a single control center for an innovative multifunctional complex.
-
Managed the writing of Project Specific Technical Specifications.
-
With regards tourban planning, engineering and architecture concept collaborated with NBBJ Ltd , Ramboll UK (engioneering concept), Impuls LT, Sun Medical Center, Colliers International Group, ENERGOPROJECT OPREMA A.D. BEOGRAD
June 2011 – October 2014: Head of Design Department in Teplov LLC, Minsk, Belarus
Design and supply of equipment
Key achievements:
-
Created a for-profit contract based design group, incl. 5 employees, achieved a full payback in a year, introduced a few process automation projects.
-
Implemented several projects and supervised the construction of heating, ventilation, and air conditioning systems for premium class facilities with interior design, including residential cottages measuring 400-1,200m2, Mercury, Accor hotels, OMA, Korona shopping centers, retail and office complex, class A administrative buildings, cafes, restaurants, residential multi-apartment houses with pools.
-
Completed several projects related to the refrigeration and air conditioning systems design and installation for data centers and server rooms.
-
Developed a hotel project according to Mercury standards (Accor)
September 2005 – May 2011: Minsk, Belarus
Design of large industrial facilities with various technological processes and hazard classes
Higher education
2000 – 2005 Belarusian National Technical University, Minsk, Belarus
Faculty of Energy Construction, Major in Construction Engineering/ Heat and Gas Supply, Ventilation and Air Pool Security