Assembly Space HVAC
Sections
Occupants as Dominant Load in High-Density Spaces
Engineering analysis of occupant heat gains as primary cooling loads in assembly spaces. Covers sensible and latent load calculations, diversity factors, and system sizing.
Spectator Area HVAC Design for Gymnasiums
Engineering analysis of bleacher and seating ventilation including intermittent high-occupancy cooling loads, separate zone control, and ASHRAE assembly space requirements.