Structural Coordination for Elevated Equipment

Structural coordination between HVAC designers and structural engineers is critical for elevated equipment installations. Proper coordination ensures that building structures can safely support mechanical equipment loads while maintaining code compliance and system performance.

Engineer-of-Record Responsibilities

The structural engineer-of-record holds ultimate responsibility for verifying that building structures can accommodate HVAC equipment loads. This includes:

Structural Design Authority:

  • Review and approve all equipment loads and support configurations
  • Verify structural adequacy of mounting locations
  • Calculate required reinforcement or modifications
  • Seal structural drawings and calculations
  • Ensure code compliance for all structural elements

Load Path Verification:

  • Trace equipment loads through primary structural members
  • Verify lateral load transfer mechanisms
  • Confirm diaphragm capacity for seismic forces
  • Evaluate foundation adequacy for accumulated loads
  • Check for load concentration points requiring reinforcement

Connection Design:

  • Specify anchorage requirements and attachment details
  • Design structural supports, curbs, and equipment pads
  • Determine required embedment depths and edge distances
  • Specify reinforcement at penetrations and openings
  • Review vibration isolation attachment methods

The structural engineer must receive complete and accurate load information early in the design process to properly size structural members and connections.

Load Documentation Requirements

Comprehensive load documentation forms the foundation of structural coordination. Equipment loads must be clearly communicated and properly formatted for structural analysis.

Equipment Data Sheets:

Include the following information for each piece of equipment:

ParameterRequired Information
Operating WeightTotal weight including refrigerant, water, controls
Shipping WeightWeight during rigging and installation
FootprintEquipment base dimensions and support point locations
Center of GravityDistance from base in X, Y, Z directions
Service AccessRequired clearances and maintenance loads
Seismic CategoryIBC seismic design category and importance factor

Load Types and Combinations:

Document all applicable loads per ASCE 7:

  • Dead Loads: Equipment weight, supports, piping, conduit, controls
  • Live Loads: Service personnel, maintenance equipment, snow/ice
  • Seismic Loads: Horizontal forces based on Fp calculations
  • Wind Loads: Uplift and overturning forces on exposed equipment
  • Operating Loads: Fan thrust, compressor vibration, water hammer
  • Thermal Loads: Expansion forces in piping and supports

Provide load combinations per ASCE 7 Chapter 2 for strength design:

  • 1.2D + 1.6L + 0.5(Lr or S)
  • 1.2D + 1.0E + L + 0.2S
  • 0.9D + 1.0W

Coordination Workflow Process

Effective structural coordination follows a systematic workflow throughout project phases.

flowchart TD
    A[Equipment Selection] --> B[Load Documentation]
    B --> C[Preliminary Structural Review]
    C --> D{Structure Adequate?}
    D -->|No| E[Structural Modifications]
    D -->|Yes| F[Detailed Design]
    E --> F
    F --> G[Submittal Preparation]
    G --> H[Structural Engineer Review]
    H --> I{Approved?}
    I -->|Revisions Required| J[Address Comments]
    J --> H
    I -->|Approved| K[Fabrication/Installation]
    K --> L[Field Verification]
    L --> M[As-Built Documentation]

    style D fill:#f9f,stroke:#333
    style I fill:#f9f,stroke:#333
    style M fill:#9f9,stroke:#333

Design Development Phase:

  1. Mechanical engineer provides preliminary equipment schedules with estimated weights and locations
  2. Structural engineer reviews existing structure capacity
  3. Identify areas requiring reinforcement or relocation
  4. Establish coordination points and schedule for detailed submittals
  5. Document assumptions and design criteria

Construction Documents Phase:

Prepare detailed equipment support drawings showing:

  • Equipment outline with support point locations
  • Seismic and wind force calculations
  • Required anchorage and reinforcement
  • Coordination with roof drainage and waterproofing
  • Clearance requirements for installation and service

Include general notes specifying that contractor shall verify field conditions and obtain structural engineer approval before installation.

Submittal and Review Process

The submittal process ensures that installed equipment matches design assumptions and structural capacity.

sequenceDiagram
    participant MC as Mechanical Contractor
    participant ME as Mechanical Engineer
    participant SE as Structural Engineer
    participant GC as General Contractor

    MC->>ME: Equipment Submittal Package
    Note over MC,ME: Catalog cuts, weights, dimensions
    ME->>ME: Review for compliance
    ME->>SE: Transmit with loads summary
    SE->>SE: Verify structural adequacy
    SE-->>ME: Review comments
    ME->>MC: Consolidated review
    MC->>MC: Revise per comments
    MC->>ME: Resubmittal
    ME->>SE: Final review
    SE-->>ME: Approval
    ME->>GC: Approved for construction

Required Submittal Information:

  • Manufacturer equipment data with certified weights
  • Dimensional drawings showing support point locations
  • Center of gravity location for seismic force calculation
  • Seismic certification or test reports (if required)
  • Anchorage details and installation instructions
  • Vibration isolation specifications and details
  • Service clearance requirements

Structural Review Checklist:

The structural engineer verifies:

  • Equipment weight matches design assumptions (±10% tolerance typical)
  • Support point locations align with structural members
  • Seismic forces are within design parameters
  • Anchorage details are adequate and constructible
  • Reinforcement requirements are satisfied
  • Roof penetrations do not compromise structural integrity
  • Installation sequence will not overstress structural members

Interface Documentation

Maintain clear documentation of the mechanical-structural interface throughout the project:

Coordination Drawings:

Prepare composite drawings showing:

  • Structural framing plan with beam and joist locations
  • Equipment footprints overlaid on structural grid
  • Load transfer paths highlighted
  • Conflict resolution details
  • Reinforcement locations

Load Summary Tables:

Create summary tables for each roof level or equipment platform:

Equipment IDWeight (lb)Seismic Force (lb)Support TypeStructural Review Status
AHU-13,2001,920Steel curbApproved 03/15/25
CU-1 through 4850 ea.510 ea.Concrete padApproved 03/18/25
ERV-11,450870Roof curbPending review

Change Order Documentation:

When equipment changes occur:

  1. Notify structural engineer immediately
  2. Submit revised load documentation
  3. Obtain structural review and approval
  4. Document impact on construction schedule
  5. Update as-built drawings

Field Verification and As-Built Requirements

Final coordination extends through installation and closeout:

Pre-Installation Verification:

  • Confirm structural support locations in field
  • Verify anchor bolt embedment and spacing
  • Check structural reinforcement installation
  • Document any field modifications required

Installation Inspection:

Structural engineer should observe:

  • Critical anchor installations
  • Equipment setting and alignment
  • Load distribution verification
  • Penetration reinforcement

As-Built Documentation:

Update drawings to reflect:

  • Final equipment locations and weights
  • Actual anchor locations and details
  • Field modifications to structural supports
  • Penetration locations and reinforcement

Proper structural coordination protects building integrity, ensures code compliance, and prevents costly field modifications. Early engagement, complete documentation, and systematic review processes are essential for successful elevated equipment installations.