Change Order Management
Change order management represents a critical administrative function in HVAC construction projects, requiring systematic processes for evaluating, pricing, documenting, and implementing modifications to the original contract scope.
Change Order Types
Owner-Directed Changes
Scope Additions
- Additional HVAC zones or equipment
- Increased capacity requirements
- Enhanced control functionality
- Additional filtration stages
- Expanded distribution systems
Scope Deletions
- Eliminated spaces or zones
- Reduced system capacity
- Value engineering substitutions
- Alternate equipment selections
- Simplified control sequences
Design Modifications
- Revised equipment locations
- Altered ductwork routing
- Modified piping configurations
- Changed control strategies
- Updated performance specifications
Contractor-Initiated Changes
Differing Site Conditions
- Inadequate structural support for equipment
- Existing utilities conflicts
- Insufficient clearances
- Unforeseen obstructions
- Inaccessible installation locations
Design Deficiencies
- Missing coordination between trades
- Incomplete specifications
- Conflicting drawing information
- Unworkable installation details
- Inadequate equipment access provisions
Constructability Issues
- Installation sequence conflicts
- Equipment rigging limitations
- Temporary support requirements
- Access restrictions
- Coordination modifications
Field-Directed Changes
Construction Change Directives (CCD)
- Immediate work authorization
- Pricing to be determined later
- Time impact estimated
- Documentation of necessity
- Owner authorization required
Request for Information (RFI) Generated Changes
- Clarification reveals scope gap
- Interpretation requires additional work
- Resolution necessitates modification
- Coordination exposes deficiency
Change Identification Process
Initial Recognition
Field Observation
- Conditions differ from drawings
- Installation conflicts discovered
- Access limitations identified
- Coordination gaps revealed
- Equipment incompatibilities found
Design Review
- Specification inconsistencies
- Drawing discrepancies
- Performance conflicts
- Code compliance issues
- Constructability concerns
Owner Requirements
- Program modifications
- Schedule adjustments
- Budget reallocations
- Performance enhancements
- Operational changes
Pricing Procedures
Cost Components
Material Costs
- Equipment unit prices
- Material quantities
- Delivery charges
- Storage requirements
- Handling costs
- Warranty extensions
Labor Costs
- Direct labor hours
- Labor rates by classification
- Overtime premiums
- Crew size requirements
- Productivity factors
- Learning curve adjustments
Equipment Costs
- Crane rental duration
- Rigging equipment
- Temporary hoisting
- Specialized tools
- Testing equipment
- Protection requirements
Subcontractor Costs
- Affected trade impacts
- Coordination requirements
- Schedule modifications
- Markup percentages
- Bond increases
Indirect Costs
- Project management time
- Engineering support
- Supervision extensions
- General conditions extension
- Mobilization costs
- Temporary facilities
Markup Structure
Overhead Allocation
- Home office overhead: 10-15%
- Project overhead: 5-10%
- Small tools and consumables: 1-3%
- Equipment depreciation
- Insurance increases
- Bond cost increases
Profit Margins
- Contractor profit: 10-15%
- Subcontractor profit: included
- Risk factors: 0-5%
- Complexity premiums
- Schedule impact allowances
Contract-Specified Markups
| Cost Component | Typical Markup |
|---|---|
| Material | 15% |
| Labor | 20% |
| Equipment rental | 10% |
| Subcontractor work | 10% |
| Owner-supplied material labor | 25% |
Time Extension Analysis
Schedule Impact Evaluation
Critical Path Analysis
- Activity placement on critical path
- Float availability
- Predecessor relationships
- Successor dependencies
- Concurrent activity impacts
Duration Calculation
- Work quantity analysis
- Productivity rates
- Crew size optimization
- Weather considerations
- Coordination requirements
Float Consumption
- Total float available
- Free float impact
- Shared float allocation
- Path convergence effects
Time-Related Costs
Extended General Conditions
- Site supervision continuation
- Temporary facilities
- Site utilities extension
- Security services
- Temporary protection
- Project management time
Acceleration Costs
- Premium time requirements
- Increased crew sizes
- Multiple shift operations
- Expedited material delivery
- Compressed installation schedules
Delay Damages
- Liquidated damages exposure
- Consequential costs
- Owner occupancy delays
- Revenue loss considerations
Documentation Requirements
Initial Documentation
Change Order Request (COR)
- Unique identification number
- Date of identification
- Originator information
- Detailed scope description
- Justification narrative
- Supporting documentation references
Scope Definition
- Detailed work description
- Drawing references and markups
- Specification section citations
- Material specifications
- Performance requirements
- Quality standards
Supporting Information
- Field photographs
- Measurement data
- Existing condition documentation
- Obstruction surveys
- Coordination drawings
- Product data sheets
Pricing Documentation
Cost Breakdown
- Material itemization with quantities
- Labor hours by classification
- Equipment rental durations and rates
- Subcontractor quotations
- Indirect cost calculations
- Markup applications
Time Impact Documentation
- Schedule analysis narrative
- CPM logic diagrams
- Time impact analysis calculations
- Float consumption charts
- Critical path shifts
- Delay justification
Quotations and Bids
- Material supplier quotations
- Subcontractor proposals
- Equipment rental rates
- Specialty consultant fees
- Testing service costs
Approval Documentation
Negotiation Records
- Meeting minutes
- Email correspondence
- Pricing discussions
- Scope clarifications
- Time agreement negotiations
Final Change Order
- CO number and date
- Complete scope description
- Agreed price breakdown
- Time extension granted
- Contract sum adjustment
- Substantial completion date revision
- Authorization signatures
Approval Workflows
Contractor Review Process
Estimating Department
- Cost validation
- Quantity verification
- Rate confirmation
- Markup application
- Completeness check
Project Management
- Scope review
- Impact assessment
- Risk evaluation
- Profit analysis
- Authorization recommendation
Executive Review
- Threshold-based requirements
- Risk assessment
- Client relationship considerations
- Margin evaluation
Design Team Review
Engineer/Architect Review
- Technical feasibility
- Design intent preservation
- Code compliance verification
- Specification conformance
- Coordination impact assessment
Cost Estimate Validation
- Quantity verification
- Unit cost reasonableness
- Markup appropriateness
- Time extension justification
- Independent cost opinion
Recommendation to Owner
- Technical necessity confirmation
- Cost reasonableness opinion
- Alternative considerations
- Impact summary
- Approval recommendation
Owner Approval Process
Project Manager Review
- Budget impact analysis
- Necessity validation
- Cost reasonableness assessment
- Schedule impact evaluation
- Contract compliance verification
Budget Authority Approval
- Expenditure authorization limits
- Contingency availability
- Funding source identification
- Budget reallocation approval
Executive Authorization
- Threshold-based requirements
- Board approval for major changes
- Funding approval
- Final authorization signature
Impact Analysis
Cost Impact Assessment
Direct Cost Impact
- Immediate change costs
- Associated modifications required
- Owner-furnished equipment coordination
- Commissioning scope additions
- Warranty modifications
Indirect Cost Impact
- Schedule extension costs
- Other trade impacts
- Escalation exposure
- Financing cost increases
- Opportunity costs
Budget Analysis
- Contingency consumption
- Remaining budget capacity
- Cash flow modifications
- Payment schedule impacts
- Funding availability
Schedule Impact Assessment
Activity-Level Analysis
- New activity durations
- Logic tie modifications
- Resource loading impacts
- Constraint introductions
- Milestone effects
Project-Level Impact
- Substantial completion date
- Final completion date
- Interim milestone dates
- Owner move-in dates
- Seasonal work windows
Recovery Options
- Acceleration possibilities
- Resequencing opportunities
- Resource augmentation
- Multiple shift operations
- Value engineering time savings
Quality Impact Assessment
Performance Implications
- System capacity modifications
- Efficiency changes
- Control capability alterations
- Reliability impacts
- Maintainability considerations
Standard Compliance
- Code conformance maintenance
- Specification adherence
- Industry standard compliance
- Warranty preservation
- Certification requirements
Risk Impact Assessment
Technical Risks
- Integration complications
- Performance uncertainties
- Installation challenges
- Commissioning complexity
- Long-term reliability
Commercial Risks
- Cost overrun exposure
- Schedule delay potential
- Dispute likelihood
- Claim possibilities
- Relationship impacts
HVAC-Specific Change Considerations
Equipment Changes
Capacity Modifications
- Load calculation impacts
- Distribution system adequacy
- Energy model updates
- Utility service verification
- Control system capacity
- Space allocation confirmation
Equipment Substitutions
- Performance equivalency verification
- Physical dimension compatibility
- Connection point alignment
- Electrical service adequacy
- Control interface compatibility
- Maintenance access preservation
Lead Time Impacts
- Procurement duration extensions
- Critical path implications
- Installation window effects
- Seasonal installation constraints
- Commissioning schedule impacts
Distribution System Changes
Ductwork Modifications
- Pressure drop recalculations
- Velocity verification
- Acoustic impact analysis
- Insulation requirement changes
- Fire damper relocations
- Balancing implications
Piping Alterations
- Hydraulic calculations updates
- Pipe size adequacy verification
- Pump selection confirmation
- Expansion compensation adequacy
- Insulation modifications
- Heat loss/gain recalculations
Routing Changes
- Coordination conflict resolution
- Clearance verification
- Support structure modifications
- Slope requirements maintenance
- Access for maintenance
- Seismic bracing revisions
Control System Changes
Sequence Modifications
- Programming time requirements
- Point count increases
- Controller capacity verification
- Interface modifications
- Testing scope additions
- Documentation updates
Integration Impacts
- Protocol compatibility
- Network capacity
- Existing system integration
- Operator interface changes
- Historical trending effects
- Alarm management updates
Testing and Balancing Changes
Additional TAB Requirements
- Device quantity increases
- Testing time extensions
- Report modifications
- Witness test scheduling
- Rebalancing necessities
Performance Verification
- Acceptance criteria modifications
- Measurement point additions
- Monitoring duration extensions
- Seasonal testing requirements
Commissioning Impacts
Scope Additions
- Equipment commissioning extensions
- Functional test additions
- Training scope increases
- Documentation expansions
- Warranty period extensions
Schedule Modifications
- Commissioning timeline shifts
- Seasonal testing windows
- Occupancy coordination
- Authority having jurisdiction interactions
Change Order Negotiation
Pricing Negotiations
Cost Validation Strategies
- Independent cost estimates
- Historical data comparisons
- Subcontractor bid verification
- Material cost confirmation
- Labor hour reasonableness checks
Negotiation Approaches
- Item-by-item review
- Lump sum negotiations
- Time and material agreements
- Unit price applications
- Not-to-exceed limits
Value Engineering During Changes
- Alternative material options
- Modified installation methods
- Simplified details
- Schedule optimization
- Scope refinement
Time Negotiations
Schedule Analysis Review
- Logic validation
- Duration reasonableness
- Resource loading verification
- Float ownership discussions
- Concurrent delay considerations
Mitigation Strategies
- Acceleration options
- Resequencing possibilities
- Resource increases
- Work hour extensions
- Prefabrication opportunities
Dispute Resolution
Common Disputes
Pricing Disagreements
- Excessive markup claims
- Unreasonable quantities
- Inflated unit costs
- Inappropriate indirect costs
- Profit percentage conflicts
Scope Interpretation
- Included work boundaries
- Related modifications
- Coordination responsibilities
- Temporary measures
- Final condition requirements
Time Extension Disagreements
- Critical path disputes
- Float ownership claims
- Concurrent delay allocation
- Acceleration requirements
- Delay damage exposure
Resolution Methods
Direct Negotiation
- Project-level discussions
- Executive involvement
- Technical review sessions
- Cost reconciliation meetings
Mediation
- Neutral third-party facilitation
- Non-binding recommendations
- Expedited resolution
- Relationship preservation
Dispute Review Boards
- Standing project boards
- Technical expertise
- Real-time resolution
- Binding or non-binding decisions
Arbitration
- Contract-specified procedures
- Binding decisions
- Faster than litigation
- Limited appeal options
Change Order Administration
Tracking Systems
Change Log Maintenance
- Chronological listing
- Status tracking
- Pricing summary
- Time impact summary
- Approval status monitoring
Budget Tracking
- Original contract sum
- Approved change orders
- Pending change orders
- Remaining contingency
- Projected final cost
Schedule Tracking
- Time extensions granted
- Cumulative delay
- Remaining float
- Projected completion date
- Critical path status
Reporting Requirements
Monthly Progress Reports
- Change order summary
- Pending changes listing
- Budget status
- Schedule impact summary
- Dispute status
Owner Reporting
- Change order register
- Cost impact analysis
- Schedule implications
- Budget consumption
- Forecast to complete
Record Keeping
Project Files
- Complete change order packages
- Correspondence files
- Pricing documentation
- Schedule analyses
- Approval records
Closeout Documentation
- Final change order log
- As-built drawing coordination
- Specification modifications
- O&M manual updates
- Warranty documentation adjustments
Best Practices
Proactive Change Management
Early Identification
- Regular coordination reviews
- Constructability assessments
- RFI pattern analysis
- Field condition surveys
- Design completion reviews
Pricing Efficiency
- Pre-negotiated unit prices
- Standard markup agreements
- Quick-turn pricing teams
- Cost database maintenance
- Subcontractor relationships
Streamlined Approvals
- Defined authority levels
- Electronic workflow systems
- Standard forms and procedures
- Regular review meetings
- Expedited process for minor changes
Documentation Excellence
Comprehensive Records
- Complete justification narratives
- Extensive photographic documentation
- Detailed cost breakdowns
- Thorough schedule analyses
- Clear scope descriptions
Timely Submissions
- Immediate notice of changes
- Prompt pricing submissions
- Rapid response to inquiries
- Regular status updates
Relationship Management
Transparent Communication
- Open pricing discussions
- Clear scope explanations
- Honest impact assessments
- Collaborative problem solving
Fair Pricing
- Reasonable markups
- Accurate quantities
- Market-based unit costs
- Justified indirect costs
- Appropriate profit margins
Dispute Avoidance
- Early conflict resolution
- Reasonable positions
- Compromise willingness
- Long-term relationship focus
- Professional conduct
The effective management of change orders requires systematic processes, thorough documentation, transparent communication, and collaborative problem-solving to successfully navigate the inevitable modifications that occur during HVAC construction projects while maintaining project relationships, budgets, and schedules.
Sections
Change Types
Components
- Owner Requested Changes
- Design Changes Corrections
- Unforeseen Conditions
- Code Requirement Changes
- Value Engineering Changes
- Constructability Improvements
Change Process
Components
- Change Order Request
- Pricing Proposal
- Schedule Impact Analysis
- Design Review Approval
- Owner Authorization
- Change Directive
- Construction Change Directive Ccd
- Change Order Log
- Cost Tracking Budget Impact