Change Order Management

Change order management represents a critical administrative function in HVAC construction projects, requiring systematic processes for evaluating, pricing, documenting, and implementing modifications to the original contract scope.

Change Order Types

Owner-Directed Changes

Scope Additions

  • Additional HVAC zones or equipment
  • Increased capacity requirements
  • Enhanced control functionality
  • Additional filtration stages
  • Expanded distribution systems

Scope Deletions

  • Eliminated spaces or zones
  • Reduced system capacity
  • Value engineering substitutions
  • Alternate equipment selections
  • Simplified control sequences

Design Modifications

  • Revised equipment locations
  • Altered ductwork routing
  • Modified piping configurations
  • Changed control strategies
  • Updated performance specifications

Contractor-Initiated Changes

Differing Site Conditions

  • Inadequate structural support for equipment
  • Existing utilities conflicts
  • Insufficient clearances
  • Unforeseen obstructions
  • Inaccessible installation locations

Design Deficiencies

  • Missing coordination between trades
  • Incomplete specifications
  • Conflicting drawing information
  • Unworkable installation details
  • Inadequate equipment access provisions

Constructability Issues

  • Installation sequence conflicts
  • Equipment rigging limitations
  • Temporary support requirements
  • Access restrictions
  • Coordination modifications

Field-Directed Changes

Construction Change Directives (CCD)

  • Immediate work authorization
  • Pricing to be determined later
  • Time impact estimated
  • Documentation of necessity
  • Owner authorization required

Request for Information (RFI) Generated Changes

  • Clarification reveals scope gap
  • Interpretation requires additional work
  • Resolution necessitates modification
  • Coordination exposes deficiency

Change Identification Process

Initial Recognition

Field Observation

  • Conditions differ from drawings
  • Installation conflicts discovered
  • Access limitations identified
  • Coordination gaps revealed
  • Equipment incompatibilities found

Design Review

  • Specification inconsistencies
  • Drawing discrepancies
  • Performance conflicts
  • Code compliance issues
  • Constructability concerns

Owner Requirements

  • Program modifications
  • Schedule adjustments
  • Budget reallocations
  • Performance enhancements
  • Operational changes

Pricing Procedures

Cost Components

Material Costs

  • Equipment unit prices
  • Material quantities
  • Delivery charges
  • Storage requirements
  • Handling costs
  • Warranty extensions

Labor Costs

  • Direct labor hours
  • Labor rates by classification
  • Overtime premiums
  • Crew size requirements
  • Productivity factors
  • Learning curve adjustments

Equipment Costs

  • Crane rental duration
  • Rigging equipment
  • Temporary hoisting
  • Specialized tools
  • Testing equipment
  • Protection requirements

Subcontractor Costs

  • Affected trade impacts
  • Coordination requirements
  • Schedule modifications
  • Markup percentages
  • Bond increases

Indirect Costs

  • Project management time
  • Engineering support
  • Supervision extensions
  • General conditions extension
  • Mobilization costs
  • Temporary facilities

Markup Structure

Overhead Allocation

  • Home office overhead: 10-15%
  • Project overhead: 5-10%
  • Small tools and consumables: 1-3%
  • Equipment depreciation
  • Insurance increases
  • Bond cost increases

Profit Margins

  • Contractor profit: 10-15%
  • Subcontractor profit: included
  • Risk factors: 0-5%
  • Complexity premiums
  • Schedule impact allowances

Contract-Specified Markups

Cost ComponentTypical Markup
Material15%
Labor20%
Equipment rental10%
Subcontractor work10%
Owner-supplied material labor25%

Time Extension Analysis

Schedule Impact Evaluation

Critical Path Analysis

  • Activity placement on critical path
  • Float availability
  • Predecessor relationships
  • Successor dependencies
  • Concurrent activity impacts

Duration Calculation

  • Work quantity analysis
  • Productivity rates
  • Crew size optimization
  • Weather considerations
  • Coordination requirements

Float Consumption

  • Total float available
  • Free float impact
  • Shared float allocation
  • Path convergence effects

Extended General Conditions

  • Site supervision continuation
  • Temporary facilities
  • Site utilities extension
  • Security services
  • Temporary protection
  • Project management time

Acceleration Costs

  • Premium time requirements
  • Increased crew sizes
  • Multiple shift operations
  • Expedited material delivery
  • Compressed installation schedules

Delay Damages

  • Liquidated damages exposure
  • Consequential costs
  • Owner occupancy delays
  • Revenue loss considerations

Documentation Requirements

Initial Documentation

Change Order Request (COR)

  • Unique identification number
  • Date of identification
  • Originator information
  • Detailed scope description
  • Justification narrative
  • Supporting documentation references

Scope Definition

  • Detailed work description
  • Drawing references and markups
  • Specification section citations
  • Material specifications
  • Performance requirements
  • Quality standards

Supporting Information

  • Field photographs
  • Measurement data
  • Existing condition documentation
  • Obstruction surveys
  • Coordination drawings
  • Product data sheets

Pricing Documentation

Cost Breakdown

  • Material itemization with quantities
  • Labor hours by classification
  • Equipment rental durations and rates
  • Subcontractor quotations
  • Indirect cost calculations
  • Markup applications

Time Impact Documentation

  • Schedule analysis narrative
  • CPM logic diagrams
  • Time impact analysis calculations
  • Float consumption charts
  • Critical path shifts
  • Delay justification

Quotations and Bids

  • Material supplier quotations
  • Subcontractor proposals
  • Equipment rental rates
  • Specialty consultant fees
  • Testing service costs

Approval Documentation

Negotiation Records

  • Meeting minutes
  • Email correspondence
  • Pricing discussions
  • Scope clarifications
  • Time agreement negotiations

Final Change Order

  • CO number and date
  • Complete scope description
  • Agreed price breakdown
  • Time extension granted
  • Contract sum adjustment
  • Substantial completion date revision
  • Authorization signatures

Approval Workflows

Contractor Review Process

Estimating Department

  • Cost validation
  • Quantity verification
  • Rate confirmation
  • Markup application
  • Completeness check

Project Management

  • Scope review
  • Impact assessment
  • Risk evaluation
  • Profit analysis
  • Authorization recommendation

Executive Review

  • Threshold-based requirements
  • Risk assessment
  • Client relationship considerations
  • Margin evaluation

Design Team Review

Engineer/Architect Review

  • Technical feasibility
  • Design intent preservation
  • Code compliance verification
  • Specification conformance
  • Coordination impact assessment

Cost Estimate Validation

  • Quantity verification
  • Unit cost reasonableness
  • Markup appropriateness
  • Time extension justification
  • Independent cost opinion

Recommendation to Owner

  • Technical necessity confirmation
  • Cost reasonableness opinion
  • Alternative considerations
  • Impact summary
  • Approval recommendation

Owner Approval Process

Project Manager Review

  • Budget impact analysis
  • Necessity validation
  • Cost reasonableness assessment
  • Schedule impact evaluation
  • Contract compliance verification

Budget Authority Approval

  • Expenditure authorization limits
  • Contingency availability
  • Funding source identification
  • Budget reallocation approval

Executive Authorization

  • Threshold-based requirements
  • Board approval for major changes
  • Funding approval
  • Final authorization signature

Impact Analysis

Cost Impact Assessment

Direct Cost Impact

  • Immediate change costs
  • Associated modifications required
  • Owner-furnished equipment coordination
  • Commissioning scope additions
  • Warranty modifications

Indirect Cost Impact

  • Schedule extension costs
  • Other trade impacts
  • Escalation exposure
  • Financing cost increases
  • Opportunity costs

Budget Analysis

  • Contingency consumption
  • Remaining budget capacity
  • Cash flow modifications
  • Payment schedule impacts
  • Funding availability

Schedule Impact Assessment

Activity-Level Analysis

  • New activity durations
  • Logic tie modifications
  • Resource loading impacts
  • Constraint introductions
  • Milestone effects

Project-Level Impact

  • Substantial completion date
  • Final completion date
  • Interim milestone dates
  • Owner move-in dates
  • Seasonal work windows

Recovery Options

  • Acceleration possibilities
  • Resequencing opportunities
  • Resource augmentation
  • Multiple shift operations
  • Value engineering time savings

Quality Impact Assessment

Performance Implications

  • System capacity modifications
  • Efficiency changes
  • Control capability alterations
  • Reliability impacts
  • Maintainability considerations

Standard Compliance

  • Code conformance maintenance
  • Specification adherence
  • Industry standard compliance
  • Warranty preservation
  • Certification requirements

Risk Impact Assessment

Technical Risks

  • Integration complications
  • Performance uncertainties
  • Installation challenges
  • Commissioning complexity
  • Long-term reliability

Commercial Risks

  • Cost overrun exposure
  • Schedule delay potential
  • Dispute likelihood
  • Claim possibilities
  • Relationship impacts

HVAC-Specific Change Considerations

Equipment Changes

Capacity Modifications

  • Load calculation impacts
  • Distribution system adequacy
  • Energy model updates
  • Utility service verification
  • Control system capacity
  • Space allocation confirmation

Equipment Substitutions

  • Performance equivalency verification
  • Physical dimension compatibility
  • Connection point alignment
  • Electrical service adequacy
  • Control interface compatibility
  • Maintenance access preservation

Lead Time Impacts

  • Procurement duration extensions
  • Critical path implications
  • Installation window effects
  • Seasonal installation constraints
  • Commissioning schedule impacts

Distribution System Changes

Ductwork Modifications

  • Pressure drop recalculations
  • Velocity verification
  • Acoustic impact analysis
  • Insulation requirement changes
  • Fire damper relocations
  • Balancing implications

Piping Alterations

  • Hydraulic calculations updates
  • Pipe size adequacy verification
  • Pump selection confirmation
  • Expansion compensation adequacy
  • Insulation modifications
  • Heat loss/gain recalculations

Routing Changes

  • Coordination conflict resolution
  • Clearance verification
  • Support structure modifications
  • Slope requirements maintenance
  • Access for maintenance
  • Seismic bracing revisions

Control System Changes

Sequence Modifications

  • Programming time requirements
  • Point count increases
  • Controller capacity verification
  • Interface modifications
  • Testing scope additions
  • Documentation updates

Integration Impacts

  • Protocol compatibility
  • Network capacity
  • Existing system integration
  • Operator interface changes
  • Historical trending effects
  • Alarm management updates

Testing and Balancing Changes

Additional TAB Requirements

  • Device quantity increases
  • Testing time extensions
  • Report modifications
  • Witness test scheduling
  • Rebalancing necessities

Performance Verification

  • Acceptance criteria modifications
  • Measurement point additions
  • Monitoring duration extensions
  • Seasonal testing requirements

Commissioning Impacts

Scope Additions

  • Equipment commissioning extensions
  • Functional test additions
  • Training scope increases
  • Documentation expansions
  • Warranty period extensions

Schedule Modifications

  • Commissioning timeline shifts
  • Seasonal testing windows
  • Occupancy coordination
  • Authority having jurisdiction interactions

Change Order Negotiation

Pricing Negotiations

Cost Validation Strategies

  • Independent cost estimates
  • Historical data comparisons
  • Subcontractor bid verification
  • Material cost confirmation
  • Labor hour reasonableness checks

Negotiation Approaches

  • Item-by-item review
  • Lump sum negotiations
  • Time and material agreements
  • Unit price applications
  • Not-to-exceed limits

Value Engineering During Changes

  • Alternative material options
  • Modified installation methods
  • Simplified details
  • Schedule optimization
  • Scope refinement

Time Negotiations

Schedule Analysis Review

  • Logic validation
  • Duration reasonableness
  • Resource loading verification
  • Float ownership discussions
  • Concurrent delay considerations

Mitigation Strategies

  • Acceleration options
  • Resequencing possibilities
  • Resource increases
  • Work hour extensions
  • Prefabrication opportunities

Dispute Resolution

Common Disputes

Pricing Disagreements

  • Excessive markup claims
  • Unreasonable quantities
  • Inflated unit costs
  • Inappropriate indirect costs
  • Profit percentage conflicts

Scope Interpretation

  • Included work boundaries
  • Related modifications
  • Coordination responsibilities
  • Temporary measures
  • Final condition requirements

Time Extension Disagreements

  • Critical path disputes
  • Float ownership claims
  • Concurrent delay allocation
  • Acceleration requirements
  • Delay damage exposure

Resolution Methods

Direct Negotiation

  • Project-level discussions
  • Executive involvement
  • Technical review sessions
  • Cost reconciliation meetings

Mediation

  • Neutral third-party facilitation
  • Non-binding recommendations
  • Expedited resolution
  • Relationship preservation

Dispute Review Boards

  • Standing project boards
  • Technical expertise
  • Real-time resolution
  • Binding or non-binding decisions

Arbitration

  • Contract-specified procedures
  • Binding decisions
  • Faster than litigation
  • Limited appeal options

Change Order Administration

Tracking Systems

Change Log Maintenance

  • Chronological listing
  • Status tracking
  • Pricing summary
  • Time impact summary
  • Approval status monitoring

Budget Tracking

  • Original contract sum
  • Approved change orders
  • Pending change orders
  • Remaining contingency
  • Projected final cost

Schedule Tracking

  • Time extensions granted
  • Cumulative delay
  • Remaining float
  • Projected completion date
  • Critical path status

Reporting Requirements

Monthly Progress Reports

  • Change order summary
  • Pending changes listing
  • Budget status
  • Schedule impact summary
  • Dispute status

Owner Reporting

  • Change order register
  • Cost impact analysis
  • Schedule implications
  • Budget consumption
  • Forecast to complete

Record Keeping

Project Files

  • Complete change order packages
  • Correspondence files
  • Pricing documentation
  • Schedule analyses
  • Approval records

Closeout Documentation

  • Final change order log
  • As-built drawing coordination
  • Specification modifications
  • O&M manual updates
  • Warranty documentation adjustments

Best Practices

Proactive Change Management

Early Identification

  • Regular coordination reviews
  • Constructability assessments
  • RFI pattern analysis
  • Field condition surveys
  • Design completion reviews

Pricing Efficiency

  • Pre-negotiated unit prices
  • Standard markup agreements
  • Quick-turn pricing teams
  • Cost database maintenance
  • Subcontractor relationships

Streamlined Approvals

  • Defined authority levels
  • Electronic workflow systems
  • Standard forms and procedures
  • Regular review meetings
  • Expedited process for minor changes

Documentation Excellence

Comprehensive Records

  • Complete justification narratives
  • Extensive photographic documentation
  • Detailed cost breakdowns
  • Thorough schedule analyses
  • Clear scope descriptions

Timely Submissions

  • Immediate notice of changes
  • Prompt pricing submissions
  • Rapid response to inquiries
  • Regular status updates

Relationship Management

Transparent Communication

  • Open pricing discussions
  • Clear scope explanations
  • Honest impact assessments
  • Collaborative problem solving

Fair Pricing

  • Reasonable markups
  • Accurate quantities
  • Market-based unit costs
  • Justified indirect costs
  • Appropriate profit margins

Dispute Avoidance

  • Early conflict resolution
  • Reasonable positions
  • Compromise willingness
  • Long-term relationship focus
  • Professional conduct

The effective management of change orders requires systematic processes, thorough documentation, transparent communication, and collaborative problem-solving to successfully navigate the inevitable modifications that occur during HVAC construction projects while maintaining project relationships, budgets, and schedules.

Sections

Change Types

Components

  • Owner Requested Changes
  • Design Changes Corrections
  • Unforeseen Conditions
  • Code Requirement Changes
  • Value Engineering Changes
  • Constructability Improvements

Change Process

Components

  • Change Order Request
  • Pricing Proposal
  • Schedule Impact Analysis
  • Design Review Approval
  • Owner Authorization
  • Change Directive
  • Construction Change Directive Ccd
  • Change Order Log
  • Cost Tracking Budget Impact