Basis of Design in HVAC Commissioning

The Basis of Design (BOD) is the foundational engineering document that translates Owner’s Project Requirements (OPR) into technical design solutions. BOD provides the rationale, assumptions, calculations, and methodologies that justify all HVAC system selections and configurations throughout the commissioning process.

BOD Role in Commissioning

BOD serves as the technical bridge between owner requirements and constructed systems. Per ASHRAE Guideline 0-2019, BOD documentation must be developed early in design and updated throughout project phases to maintain alignment with OPR evolution. The commissioning authority uses BOD to verify that design decisions satisfy owner objectives and to develop functional performance test procedures.

BOD differs from design documents in that it explains the engineering logic rather than prescribing construction details. While drawings specify what to build, BOD articulates why those specific systems were selected and how they achieve performance targets.

BOD-OPR Relationship

graph TD
    A[Owner's Project Requirements] -->|Defines Goals| B[Basis of Design]
    B -->|Engineering Translation| C[Design Documents]
    C -->|Construction| D[Installed Systems]
    B -->|Test Criteria| E[Commissioning Plan]
    E -->|Verification| D
    D -->|Performance Data| F[Systems Manual]
    A -->|Updated Based On| G[Feasibility Analysis]
    G -->|Feeds Into| B
    B -->|Design Review| H[Value Engineering]
    H -->|Refinement| B

    style A fill:#e1f5ff
    style B fill:#fff4e1
    style E fill:#ffe1e1

The OPR establishes measurable objectives such as temperature tolerances, humidity ranges, air change rates, and energy performance targets. BOD responds by documenting the technical approach selected to meet each requirement, including alternative systems considered and the rationale for rejection.

BOD Documentation Structure

Design Assumptions

Design assumptions establish the foundational parameters upon which all calculations and selections depend. These include occupancy densities, operational schedules, plug load estimates, lighting power densities, infiltration rates, and safety factors applied to load calculations.

Document assumptions with sufficient detail to allow independent verification. State whether values derive from ASHRAE standards, local code requirements, actual measurements, or engineering judgment. Identify assumptions that require owner confirmation or validation during construction.

Climatic Design Conditions

Establish outdoor and indoor design conditions per ASHRAE Fundamentals. Document dry-bulb temperatures, wet-bulb temperatures, humidity ratios, and enthalpy values for cooling and heating design days. Include dehumidification design conditions for humidity-critical applications.

State the percentile basis for outdoor conditions (typically 0.4% for cooling, 99.6% for heating). Document any deviations from standard conditions based on risk analysis or owner requirements for enhanced reliability.

Load Calculation Methodology

Describe the calculation approach, software tools, and relevant standards applied. For cooling loads, specify whether CLTD/CLF, radiant time series (RTS), or heat balance methods were used. Document diversity factors, simultaneous load analysis, and block versus room-by-room calculation strategies.

Include internal load assumptions with supporting data sources. Document ventilation load calculations per ASHRAE Standard 62.1, including breathing zone outdoor airflow, zone air distribution effectiveness, and system ventilation efficiency.

System Design Documentation

System Descriptions

Provide narrative descriptions of each major system explaining configuration, capacity, and operational characteristics. Describe air distribution strategies, zoning approaches, and equipment staging sequences. Explain how systems interact and which components provide backup or redundancy.

Address energy recovery, economizer operation, demand-controlled ventilation, and other efficiency measures. Describe control integration between mechanical, lighting, and building management systems.

Equipment Selection Criteria

Selection FactorCriteriaJustification Basis
CapacityPeak load + safety factorLoad calculations, diversity analysis
EfficiencyMinimum performance thresholdEnergy code, lifecycle cost analysis
Part-Load PerformanceIPLV, IEER metricsOperating profile, annual energy modeling
ReliabilityMTBF, warranty termsMaintenance accessibility, owner experience
AcousticsNC/RC criteriaSpace function, owner standards
FootprintSpatial constraintsArchitectural coordination, serviceability
Lifecycle CostNPV over analysis periodEnergy costs, maintenance costs, replacement

Document the weighting factors applied when multiple criteria conflict. Explain any equipment selections that prioritize criteria other than first cost.

Control Strategies

Describe control sequences at the conceptual level rather than point-by-point detail. Explain reset strategies for supply air temperature, chilled water temperature, and hot water temperature. Document setback and setups schedules, optimal start algorithms, and demand limiting approaches.

Address integration with building automation systems, specifying communication protocols and trending requirements. Describe override capabilities and manual control access for operators.

Energy Analysis Integration

Document energy modeling assumptions including weather data sources, occupancy schedules, process loads, and system efficiencies. Describe baseline systems per ASHRAE Standard 90.1 Appendix G for code compliance or LEED certification.

Report annual energy consumption by end use, peak demand profiles, and energy cost projections. Explain how proposed systems achieve energy performance targets established in OPR.

BOD Content Requirements

BOD SectionRequired ContentUpdate Frequency
Project OverviewScope, goals, constraintsInitial + major changes
Design CriteriaCodes, standards, owner requirementsInitial + code updates
Load CalculationsPeak loads, calculation methodologyDesign development + revisions
System DescriptionsConfiguration, capacity, controlsEach design phase
Equipment SelectionPerformance specs, selection rationaleDesign development + substitutions
Energy AnalysisConsumption predictions, modeling approachDesign development + final
Assumptions LogAll design assumptions with validation statusContinuous updates

BOD Development Process

Initiate BOD development during schematic design as soon as preliminary OPR is available. Expand BOD content through design development as calculations are completed and equipment selections finalized. Update BOD to reflect value engineering outcomes, code interpretation clarifications, and owner requirement modifications.

Submit BOD to the commissioning authority for review at each design milestone. Address commissioning comments by revising design or documenting rationale for maintaining current approach. Incorporate BOD into project manuals as a permanent record of design intent for operations staff and future modifications.

The completed BOD provides the technical foundation for commissioning test procedures and performance verification. Without thorough BOD documentation, commissioning becomes subjective assessment rather than objective verification against established engineering criteria.